Back Patio Upgrade

The Back Patio is getting a face lift. Work will be starting THU 8/15  until TUE 8/20 of next week. If weather permits it may be done MON 8/19. During upgrade, the back patio will be roped off, and the back door will be CLOSED. Everyone will have to use the front entrance.  NOTE: During upgrade, use the two fire exits located on both sides of the front of the building.  

About the Author

Norris Jr. Shannon
MOTO - IT Support